| 1968
: |
The
company was established under the name Allied Engineers & Founders
producing 30 m.t. of casting per month like manifolds & valve bodies. |
| 1974
: |
The
unit was converted into a Private Limited Company with four directors
on board. |
| 1976
: |
Two
new moulding machines Kunkel Wagner APM-0 with 20 h.p compressor
were installed . |
| 1977
: |
The
first foundry in Belgaum to install Shot Blasting Machine along
with all equipments. |
| 1978
: |
The
first foundry in Belgaum to install Sand Testing & Chemical Testing
Laboratory with Metallurgical Microscope. |
| 1979
: |
Purchased
two Sand Mullers & one Sand Mixer to achieve better sand properties.
|
| 1980
: |
Two
new moulding machines Kunkel Wagner APM-2 with 30 h.p compressor
were installed. |
| 1981
: |
Commissioned
new 36 inch dia Conventional Cupola with melting rate of 3 to 3.5
m.t. per hour. |
| 1982
: |
A
new machine shop was setup to supply castings in machined condition
to customers. |
| 1983 : |
Increased production capacity to 60 m.t per month
- added moulding boxes. |
| 1984
: |
We
became the first NTPC approved foundry is South India to manufacture
& supply graded C.I.Castings. |
| 1986
: |
A
full fledged machine shop to machine any casting required by our
customers. |
| 1987
: |
Increased
production capacity to 75 m.t per month - added moulding boxes.
|
| 1995
: |
Developed
low alloy C.I.Castings with alloy additions like Molybdenum, Nickel,
Chromium in Cupola. |
| 1996
: |
OM
VINAYAK ARTS a machine shop was established by installing SPMs to
machine sheaves & other components for lifts & diesel engines. |
| 1997
: |
Carbon
Silicon Analyser was installed to achieve consistency in Metallurgy.
Computerised all processes like marketing, sales, production, stores,
accounts etc. |
| 1998
: |
125
kva D.G. set was installed to have uninterrupted power supply. |
| 2000
: |
Increased
production capacity to 100 m.t per month - added moulding boxes. |
| 2002
: |
The
company was accredited with ISO 9001:2000. |
| 2003
: |
250
kg Sand Muller, Sand Siever & Sand Dryer were installed to achieve
better sand properties. |
| 2004
: |
Increased
production capacity to 175 m.t per month - added moulding boxes.
|